TAP · HOLD · CHAIN · SWIPE

PULSIVA

Your accuracy is the instrument.

A neon rhythm game on original synthwave — and neon reworks of the classics. Every hit rings out in the song's own key; the cleaner your timing, the brighter the tone.

Download on the App Store iPHONE · iPAD
SYNESTHESIA ENGINE

A game that listens back.

Most rhythm games score your timing. PULSIVA performs it — your hits are woven into the mix, live, in key.

PLAY THE MUSIC, NOT ALONG TO IT

Every note maps to a pitch in the track's own key, and your judgment shapes the sound — land it clean and the tone sings brighter. You can hear yourself getting better.

CRITICAL · ±30 MS

An arcade-grade judgment ladder with 1,000,000-point achievement scoring and grades from D to SSS. ALL CRITICAL is reserved for flawless runs — proof of skill, not grind.

FIFTEEN TRACKS

Nine all-synth originals plus six neon reworks of public-domain classics — Canon in D, Für Elise, Flight of the Bumblebee and more. 70 to 172 BPM, each with its own key and a live arrangement. 60 charts from EASY to EXPERT.

READY IN 60 SECONDS

A one-minute tutorial, automatic latency calibration, adjustable note speed, and colorblind-safe note shapes. No account needed, and the game is fully playable offline.

PULSIVA gameplay — a golden chain arcs across the radial playfield at combo 138
FOUR NOTE LANGUAGES

Ride the chain.

Taps, holds, swipes, and gold chains that snake across a radial playfield built for thumbs. Notes bloom from the center and break against the judgment arc exactly on the beat — read the ring, not a falling highway.

PULSIVA result screen — SSS grade, 1,000,000 score, ALL CRITICAL
THE SCORE THAT MEANS IT

Chase the million.

Achievement scoring out of 1,000,000 with a mean-offset readout after every run, so you know if you're early, late, or dialed in. SSS demands 95%. ALL CRITICAL demands everything.

PULSIVA track select — Aurora Drift with EASY, NORMAL, HARD and EXPERT charts
70 → 172 BPM

Pick your fight.

Every track ships with four charts, EASY through EXPERT. Start in the drift of 82 BPM and work your way up to Event Apex, where the sixteenth notes never stop coming.

PULSIVA on iPad — portrait gameplay with the full radial ring
POCKET OR CANVAS

iPhone wide.
iPad tall.

Landscape on iPhone for thumb-zone speed; full-height portrait on iPad with a bigger ring and wider arcs. Same charts, same timing, tuned per device. Headphones strongly recommended.

SOUNDTRACK

Fifteen tracks. One void.

Nine synthwave originals plus six neon reworks of public-domain classics — every chart is cut from its track's own arrangement.

01Aurora Drift82 BPM
02Tidal Glow94 BPM
03Neon Bloom108 BPM
04Circuit Pulse122 BPM
05Prism Dive132 BPM
06Velvet Surge142 BPM
07Hyper Cascade152 BPM
08Starfall Run162 BPM
09Event Apex172 BPM
10Canon in D70 BPM
11Für Elise72 BPM
12Spring92 BPM
13Rondo alla Turca124 BPM
14Flight of the Bumblebee126 BPM
15Can-Can136 BPM
60 CHARTS · EASY → EXPERT · THIS PAGE PULSES AT 122 BPM
PULSIVA

Enter the void.

Put your headphones on. The drop is waiting.

Download on the App Store iPHONE · iPAD